Land Use Example
Alignment Alternatives
The general creek side determinations
were chosen to minimize the number of tributary stream crossings. In
the middle of reach E-B, four possible alternatives were considered
due to the manhole depths necessary in Alternative One.
• Alternative One followed the typical project design along the
west side. This alternative required extra depth manholes. (Manhole
depths > 40’)
• Alternative Two followed the typical project design along the
east side. However, this alternative encumbered the buildable portions
of five lots.
• Alternative Two-A paralleled alternative two, but moved the
alignment within 25’ of the bank. This alternative saved the buildable
portion of the lots.
• Alternative Three moved the alignment significantly to the east,
and is centered in an existing roadway. This alternative requires the
reconstruction of the roadway and traffic detours due to the manhole
depths. However this alternative eliminates the need for a future street
main.
All alignment alternatives function from an engineering standpoint.

| Work Item |
Unit Price |
|
Alternate One |
|
| |
|
|
Qtys |
Total |
| Clearing |
$3,500 |
Ac |
3.5 |
$12,250 |
| 12" DIP Sewer 6- 8 ft Deep |
$1 |
Lf |
|
|
| 12" DIP Sewer 8-10 ft Deep |
$1 |
Lf |
14 |
$14 |
| 12" DIP Sewer 10-12 ft Deep |
$1 |
Lf |
165 |
$165 |
| 12" DIP Sewer 12-14 ft Deep |
$1 |
Lf |
48 |
$48 |
| 12" DIP Sewer 14-16 ft Deep |
$1 |
Lf |
48 |
$48 |
| 12" DIP Sewer 16-18 ft Deep |
$1 |
Lf |
48 |
$48 |
| 12" DIP Sewer 18-20 ft Deep |
$1 |
Lf |
48 |
$48 |
| 12" DIP Sewer 20-22 ft Deep |
$1 |
Lf |
48 |
$48 |
| 12" DIP Sewer 22-24 ft Deep |
$1 |
Lf |
48 |
$48 |
| 12" DIP Sewer Over 24 ft Deep |
$1 |
Lf |
918 |
$918 |
| Sewer Manhole 0-6 Ft Deep |
$2,000 |
Ea |
5 |
$10,000 |
| Extra Depth Sewer Manhole |
$150 |
Lf |
100 |
$15,000 |
| 15" Bore & Jack |
$1 |
Lf |
|
|
| Pavement Repair |
$15 |
Sy |
|
|
| Traffic Control |
|
|
|
|
| Land Value |
|
|
|
|
| |
|
|
|
|
| Total |
|
|
|
$38,635 |
| Alternate Two |
|
Alternate Two-A |
|
Alternate Three |
|
| Qtys |
Total |
Qtys |
Total |
Qtys |
Total |
| 2 |
$7,000 |
2 |
$7,000 |
1 |
$3,500 |
| 776 |
$776 |
854 |
$854 |
|
|
| 160 |
$160 |
124 |
$124 |
407 |
$407 |
| 210 |
$210 |
165 |
$165 |
90 |
$90 |
| |
|
|
|
98 |
$98 |
| |
|
|
|
98 |
$98 |
| |
|
|
|
101 |
$101 |
| |
|
|
|
103 |
$103 |
| |
|
|
|
103 |
$103 |
| |
|
|
|
103 |
$103 |
| |
|
|
|
252 |
$252 |
| 6 |
$12,000 |
6 |
$12,000 |
6 |
$12,000 |
| 15 |
$2,250 |
16 |
$2,400 |
51 |
$7,650 |
| 150 |
$150 |
150 |
$150 |
150 |
$150 |
| |
|
|
|
1600 |
$24,000 |
| |
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
| |
$22,546 |
|
$22,693 |
|
$48,655 |
Based upon the cost estimates, Alternative Two-A is the recommended
alternative for this reach. The entire recommended alignment affects
approximately 30 parcels.

|