ITEM |
DESCRIPTION |
Quantity |
Unit Price |
Total |
| |
CLEAR CREEK BASIN SANITARY SEWER FORCE MAIN & FUTURE GRAVITY SEWER
PROJECT # 292-02-672: FORCE MAIN |
|
|
|
| 1 |
For Furnishing and Installing Force Main Pipe, with Grooved End
Restrained Joints, as specified, complete in place 12-Inch PVC Force
Main Pipe (Pressure Class-200) |
|
|
|
| A. |
12-inch PVC Force Main Pipe |
|
|
|
| 1 |
0 to 6 Depth |
63 |
$54.90 |
$3,458.70 |
| 2 |
6 to 8 Depth |
239 |
$56.90 |
$13,599.10 |
| 3 |
8 to 10 Depth |
1,721 |
$59.50 |
$102,399.50 |
| 4 |
10 to 12 Depth |
1,232 |
$62.85 |
$77,431.20 |
| 5 |
12 to 14 Depth |
2,822 |
$67.25 |
$189,779.50 |
| 6 |
14 to 16 Depth |
2,638 |
$73.25 |
$193,233.50 |
| 7 |
16 to 18 Depth |
1,301 |
$82.10 |
$106,812.10 |
| 8 |
Over 18 Depth |
690 |
$90.65 |
$62,548.50 |
| 2 |
For Substituting Restrained Joint Ductile Iron Pipe, as specified,
complete in place. (Add on to Item 1) 12-Inch Ductile Iron Pipe
(Pressure Class-350) |
100 |
$22.35 |
$2,235.00 |
| 3 |
Not Used |
|
|
|
| 4 |
For Furnishing and Installing Anti-Seep Collars, as specified, complete
in place. |
8 |
$435.00 |
$3,480.00 |
| 5 |
For Connection to Sanitary Sewer MH at Blair Road (NC-51), as specified,
complete in place. |
1 |
$2,375.00 |
$2,375.00 |
| 6 |
For Furnishing and Installing Stone Bedding and Stabilization, as
specified, complete in place. (For Undercut Excavation as directed
by the Engineer) |
1,000 |
$24.00 |
$24,000.00 |
| 7 |
For Furnishing and Installing Additional Fittings not indicated
on the Plans, as specified, complete in place. |
200 |
$4.50 |
$900.00 |
| 8 |
For Removal and Disposal of Existing Manholes as shown on the Plans,
as specified, and as directed by the Engineer. |
2 |
$575.00 |
$1,150.00 |
| 9 |
For Jacking 12 PVC Force Main Carrier Pipe into existing 18 DIP
Casing Pipe under I-485, as shown on the Plans, as specified, and
as directed by the Engineer. |
414 |
$73.30 |
$30,346.20 |
| 10 |
For Cutting (Sawing) and Replacing All Asphaltic Pavement as specified,
complete in place. (Also including any concrete encountered under
as asphaltic surface treatment) H-Binder & I-1 or I-2 |
273 |
$35.50 |
$9,705.15 |
| 11 |
For Cutting and Replacing Concrete Driveways and Walkways, as specified,
complete in place Concrete Driveways (minimum 6" deep with wire
reinforcing) |
39 |
$47.85 |
$1,866.15 |
| 12 |
For Furnishing and Installing Soft Shoulder Signs as specified,
complete in place. |
2 |
$143.00 |
$286.00 |
| 13 |
For Constructing and Maintaining Various Erosion Control Devices,
as specified. |
|
|
|
| A |
Silt Fence |
14,600 |
$2.10 |
$30,660.00 |
| B |
Temporary Stream Crossings/Stream Bank Restoration |
12 |
$5,390.00 |
$64,680.00 |
| C |
Temporary Construction Entrance |
2 |
$1,080.00 |
$2,160.00 |
| D |
Rock Check Dams |
10 |
$75.00 |
$750.00 |
| 14 |
For Furnishing and Installing Stone Rip-Rap, as specified, complete
in place. |
50 |
$30.00 |
$1,500.00 |
| 15 |
For Furnishing and Installing Brass Disk Marker, as specified, complete
in place. |
2 |
$160.00 |
$320.00 |
| 16 |
For Furnishing and Installing Force Main Marker Posts, as specified,
complete in place. |
40 |
$100.00 |
$4,000.00 |
| 17 |
For Solid Rock Excavation, as specified, complete in place ($40/CY
minimum). |
7,000 |
$40.00 |
$280,000.00 |
| 18 |
For Fertilizer, Seed, and Mulching, as specified, complete in place |
53,995 |
$0.55 |
$29,697.25 |
| 19 |
For Clearing, Grubbing & Disposal of Debris, as specified, complete
in place |
10,706 |
$4.20 |
$44,965.20 |
| 20 |
For Hydrostatic and Leakage Tests, as specified, complete in place. |
11,120 |
$0.70 |
$7,784.00 |
| 21 |
Not Used |
|
|
|
| |
Sum for project 292-02-672, Force Main |
|
|
$1,292,122.05 |
| |
CLEAR CREEK BASIN SANITARY SEWER FORCE MAIN & FUTURE GRAVITY SEWER
PROJECT # 292-02-672: GRAVITY SEWER |
|
|
|
| 22 |
For Furnishing and Installing Stone Bedding and stabilization, as
specified, complete in place. |
20 |
$24.00 |
$480.00 |
| 23 |
For Furnishing and Installing (Dry-Bore) with Steel Encasement,
as specified, complete in place. |
|
|
|
| A |
24-inch Diameter Casing (0.250) |
57 |
$333.00 |
$18,981.00 |
| B |
Concrete Barriers (Bore Pits) |
50 |
$3.60 |
$180.00 |
| 24 |
For Mobilization, Excavation and Backfill for Bore Installation,
as specified, complete in place. |
1 |
$4,185.00 |
$4,185.00 |
| 25 |
For Grouting Incomplete Encasing Pipe, as specified, complete in
place 24-inch Encasing Pipe |
14 |
$265.00 |
$3,710.00 |
| 26 |
For Installing 48-inch Tunnel (12 Gauge), Anchoring the Carrier
Pipe, and necessary mortar end sealing, as specified, complete in
place. The unit price will not be less than the unit bid price for
boring. |
14 |
$1,815.00 |
$25,410.00 |
| 27 |
For Furnishing and Installing Soft Shoulder Signs as specified,
complete in place. |
4 |
$143.00 |
$572.00 |
| 28 |
For Constructing and Maintaining Various Erosion Control Devices,
as specified. |
|
|
|
| A |
Silt Fence |
540 |
$2.10 |
$1,134.00 |
| 29 |
For Furnishing and Installing Gravity Sanitary Sewer Pipe, as specified,
complete in place. |
|
|
|
| A |
12-inch Sanitary Sewer Pipe |
|
|
|
| 1 |
0 to 6 Depth |
56 |
$46.75 |
$2,618.00 |
| 2 |
6 to 8 Depth |
50 |
$49.10 |
$2,455.00 |
| 3 |
8 to 10 Depth |
25 |
$59.15 |
$1,478.75 |
| 4 |
10 to 12 Depth |
222 |
$66.25 |
$14,707.50 |
| 5 |
12 to 14 Depth |
59 |
$76.60 |
$4,519.40 |
| 30 |
For Removing Existing 8 Sanitary Sewer Pipe, as specified, complete
in place. (Add onto Item 29) |
236 |
$10.20 |
$2,407.20 |
| 31 |
For Removing Existing 8 Sanitary Sewer Pipe in 18 Steel Casing
and Replacing with 12, as specified, complete in place. |
110 |
$64.00 |
$7,040.00 |
| 32 |
For Pipe Bursting Existing 8 Sanitary Sewer Pipe and Increasing
Size to 12, as specified, complete in place. |
423 |
$221.00 |
$93,483.00 |
| 33 |
For Connection to Existing Sanitary Sewer MH at Sta. 116 + 45.56,
as specified, complete in place. |
1 |
$2,316.00 |
$2,316.00 |
| 34 |
For Substituting Ductile Iron Pipe, as specified, complete in place. |
|
|
|
| A |
12 Ductile Iron Pipe (Pressure Class 250) (Add onto Item 29) |
50 |
$13.85 |
$692.50 |
| 35 |
For Basic 0 to 6 Depth, Manholes as specified, backfilled, complete
in place. |
|
|
|
| A |
4-foot Diameter Manholes |
|
|
|
| 1 |
Bolted Down Frame and Cover |
3 |
$1,271.00 |
$3,813.00 |
| 36 |
For Extra Depth, All Manholes as specified, backfilled, complete
in place. |
|
|
|
| A |
4-foot Diameter Manholes |
11 |
$113.00 |
$1,243.00 |
| 37 |
For adding a PVC Liner in the Manholes, as specified, complete in
place. |
|
|
|
| A |
For Basic 0 to 6 Depth Manholes |
3 |
$916.00 |
$2,748.00 |
| B |
For Extra Depth, all Manholes |
11 |
$153.00 |
$1,683.00 |
| 38 |
For Furnishing and Installing Odor Control MH, as specified, complete
in place. |
1 |
$25,290.00 |
$25,290.00 |
| 39 |
Not Used |
|
|
|
| 40 |
For Fertilizer, Seed, and Mulching, as specified complete in place. |
1,160 |
$0.55 |
$638.00 |
| 41 |
For Testing for Exfiltration, as specified complete. |
|
|
|
| A |
Sanitary Sewer Pipe |
|
|
|
| 1 |
12-inch Pipe |
945 |
$0.60 |
$567.00 |
| B |
Manholes |
|
|
|
| 1 |
4-foot Diameter Manholes |
3 |
$80.00 |
$240.00 |
| 42 |
For Removal and Disposal of Existing Above Ground Storage Tank at
STA. 114+50, as specified. |
1 |
$1,890.00 |
$1,890.00 |
| 43 |
For Abandonment of Existing Well at STA. 114+63 in accordance with
NCDENR Rules, Regulations, and Specifications. |
1 |
$600.00 |
$600.00 |
| 44 |
For Reconstructing Service Lateral Connections, as specified, complete
in place. |
5 |
$895.00 |
$4,475.00 |
| 45 |
For Removal and Replacement of Landscape Items, as specified, as
directed by the Engineer, complete in place. |
1 |
$7,325.00 |
$7,325.00 |
| |
Sum for project 292-02-672, Gravity sewer |
|
|
$236,881.35 |
| |
CLEAR CREEK GRAVITY SANITARY SEWER |
|
|
|
| |
PROJECT NUMBER 292-02-666 |
|
|
|
| 46 |
For Furnishing and Installing Gravity Sanitary Sewer Pipe, as specified,
complete in place. |
|
|
|
| A |
21-inch Sanitary Sewer Pipe |
|
|
|
| 1 |
14 to 16 Depth |
2,366 |
$56.15 |
$132,850.90 |
| 2 |
16 to 18 Depth |
1,016 |
$57.70 |
$58,623.20 |
| 3 |
18 to 20 Depth |
519 |
$59.50 |
$30,880.50 |
| 4 |
20 to 22 Depth |
135 |
$62.85 |
$8,484.75 |
| 5 |
22 to 24 Depth |
38 |
$67.25 |
$2,555.50 |
| B |
18-inch Sanitary Sewer Pipe |
|
|
|
| 1 |
0 to 6 Depth |
30 |
$49.60 |
$1,488.00 |
| 2 |
6 to 8 Depth |
10 |
$51.15 |
$511.50 |
| 3 |
8 to 10 Depth |
1,061 |
$53.00 |
$56,233.00 |
| 4 |
10 to 12 Depth |
3,596 |
$56.35 |
$202,634.60 |
| 5 |
12 to 14 Depth |
1,328 |
$60.75 |
$80,676.00 |
| 6 |
14 to 16 Depth |
637 |
$72.25 |
$46,023.25 |
| 7 |
16 to 18 Depth |
45 |
$84.15 |
$3,786.75 |
| 8 |
18 to 20 Depth |
45 |
$96.50 |
$4,342.50 |
| C |
15-inch Sanitary Sewer Pipe |
|
|
|
| 1 |
8 to 10 Depth |
1,013 |
$50.75 |
$51,409.75 |
| 2 |
10 to 12 Depth |
74 |
$54.10 |
$4,003.40 |
| D |
12-inch Sanitary Sewer Pipe |
|
|
|
| 1 |
0 to 6 Depth |
129 |
$43.10 |
$5,559.90 |
| 2 |
6 to 8 Depth |
1,112 |
$43.90 |
$48,816.80 |
| 3 |
8 to 10 Depth |
2,341 |
$45.75 |
$107,100.75 |
| 4 |
10 to 12 Depth |
1,011 |
$49.10 |
$49,640.10 |
| 5 |
12 to 14 Depth |
1,274 |
$53.50 |
$68,159.00 |
| 6 |
14 to 16 Depth |
311 |
$64.60 |
$20,090.60 |
| 7 |
16 to 18 Depth |
56 |
$76.90 |
$4,306.40 |
| E |
8-inch Sanitary Sewer Pipe |
|
|
|
| 1 |
0 to 6 Depth |
12 |
$37.90 |
$454.80 |
| 2 |
6 to 8 Depth |
83 |
$38.70 |
$3,212.10 |
| 3 |
8 to 10 Depth |
215 |
$40.50 |
$8,707.50 |
| 4 |
10 to 12 Depth |
184 |
$43.85 |
$8,068.40 |
| 5 |
12 to 14 Depth |
14 |
$48.25 |
$675.50 |
| 47 |
For Substituting Ductile Iron Pipe, as specified, complete in place. |
|
|
|
| A |
24 Ductile Iron Pipe (Pressure Class 250) (Add onto Item 47) |
105 |
$57.70 |
$6,058.50 |
| B |
18 Ductile Iron Pipe (Pressure Class 250) (Add onto Item 47) |
753 |
$25.85 |
$19,465.05 |
| C |
12 Ductile Iron Pipe (Pressure Class 250) (Add onto Item 47) |
530 |
$15.15 |
$8,029.50 |
| D |
8 Ductile Iron Pipe (Pressure Class 250) (Add onto Item 47) |
60 |
$11.35 |
$681.00 |
| 48 |
For Basic 0 to 6 Depth, Manholes as specified, backfilled, complete
in place. |
|
|
|
| A |
4-foot Diameter Manholes |
|
|
|
| 1 |
Bolted Down Frame and Cover |
47 |
$1,460.00 |
$68,620.00 |
| B |
5-foot Diameter Manholes |
|
|
|
| 1 |
Bolted Down Frame and Cover |
12 |
$2,290.00 |
$27,480.00 |
| 49 |
For Extra Depth, All Manholes as specified, backfilled, complete
in place. |
|
|
|
| A |
4-foot Diameter Manholes |
342 |
$113.00 |
$38,646.00 |
| B |
5-foot Diameter Manholes |
140 |
$157.00 |
$21,980.00 |
| 50 |
For furnishing and installing 5-inch diameter Vent Pipe, as specified,
complete in place. |
|
|
|
| A |
For Basic 0 to 6 Depth Manholes |
24 |
$1,002.00 |
$24,048.00 |
| B |
For Extra Depth, all Manholes |
96 |
$192.00 |
$18,432.00 |
| 51 |
For Furnishing and Installing Granular Bedding and Stabilization,
as specified, complete in place. |
|
|
|
| A |
Type II Bedding |
1,020 |
$1.65 |
$1,683.00 |
| B |
Type III Bedding |
19,020 |
$1.65 |
$31,383.00 |
| 52 |
For Furnishing and Installing Stone Bedding and Stabilization, as
specified, complete in place. (For Undercut Excavation as directed
by the Engineer) |
1,000 |
$24.00 |
$24,000.00 |
| 53 |
For Solid Rock Excavation, as specified, complete in place ($40/CY
minimum). |
8,000 |
$40.00 |
$320,000.00 |
| Items 54 through 57 are for non-guaranteed bores. |
|
|
|
|
| 54 |
For Furnishing and Installing (Dry-Bore) with Steel Encasement,
as specified, complete in place. |
|
|
|
| A |
30-inch Diameter Casing (0.312) |
440 |
$623.00 |
$274,120.00 |
| B |
24-inch Diameter Casing (0.250) |
128 |
$770.00 |
$98,560.00 |
| C |
18-inch Diameter Casing (0.250) |
48 |
$625.00 |
$30,000.00 |
| D |
Concrete Barriers (Bore Pits) |
190 |
$3.60 |
$684.00 |
| 55 |
For Mobilization, Excavation and Backfill for Bore Installation,
as specified, complete in place. |
8 |
$4,185.00 |
$33,480.00 |
| 56 |
For Grouting Incomplete Encasing Pipe, as specified, complete in
place |
|
|
|
| A |
30-inch Encasing Pipe (0.312) |
110 |
$283.00 |
$31,130.00 |
| B |
24-inch Encasing Pipe (0.250) |
32 |
$265.50 |
$8,496.00 |
| C |
18-inch Encasing Pipe (0.250) |
12 |
$135.00 |
$1,620.00 |
| 57 |
For Installing 48-inch Tunnel (12 Gauge), Anchoring the Carrier
Pipe, and necessary mortar end sealing, as specified, complete in
place. The unit price will not be less than the unit bid price for
boring. |
|
|
|
| A |
30-inch Encasing Pipe (0.312) |
110 |
$1,795.00 |
$197,450.00 |
| B |
24-inch Encasing Pipe (0.250) |
32 |
$1,795.00 |
$57,440.00 |
| C |
18-inch Encasing Pipe (0.250) |
12 |
$1,795.00 |
$21,540.00 |
| Items 58 through 60 are for guaranteed bores. |
|
|
|
|
| 58 |
For Furnishing and Installing (Dry-Bore) with Steel Encasement (guaranteed
casing installation), as specified, complete in place. |
|
|
|
| A |
30-inch Diameter Casing (0.312) |
186 |
$1,257.00 |
$233,802.00 |
| B |
24-inch Diameter Casing (0.250) |
80 |
$1,235.00 |
$98,800.00 |
| C |
Concrete Barriers (Bore Pits) |
60 |
$3.60 |
$216.00 |
| 59 |
Not Used |
|
|
|
| 60 |
Not Used |
|
|
|
| 61 |
For Furnishing and Installing Soft Shoulder Signs as specified,
complete in place. |
18 |
$143.00 |
$2,574.00 |
| 62 |
For Clearing, Grubbing & Disposal of Debris, as specified, complete
in place |
18,655 |
$4.20 |
$78,351.00 |
| 63 |
For Constructing and Maintaining Various Erosion Control Devices,
as specified. |
|
|
|
| A |
Silt Fence |
25,800 |
$2.10 |
$54,180.00 |
| B |
Temporary Stream Crossings/Stream Bank Restoration |
4 |
$5,390.00 |
$21,560.00 |
| C |
Temporary Construction Entrance |
6 |
$1,080.00 |
$6,480.00 |
| D |
Jute Blanket |
1,000 |
$2.15 |
$2,150.00 |
| E |
Curlex Blanket |
3,000 |
$2.50 |
$7,500.00 |
| F |
Temporary Diversion Ditch |
18,000 |
$1.25 |
$22,500.00 |
| G |
Temporary Sediment Trap |
|
|
|
| 1 |
Temporary Sediment Trap 200-300 CF |
27 |
$302.50 |
$8,167.50 |
| 2 |
Temporary Sediment Trap 700 - 1,000 CF |
25 |
$350.00 |
$8,750.00 |
| 3 |
Temporary Sediment Trap 2,500 - 3,000 CF |
11 |
$390.00 |
$4,290.00 |
| 4 |
Temporary Sediment Trap 4,500 + CF |
5 |
$430.00 |
$2,150.00 |
| 64 |
For Fertilizer, Seed, and Mulching, as specified complete in place. |
120,000 |
$0.55 |
$66,000.00 |
| 65 |
For Furnishing and Installing Stone Rip-Rap, as specified, complete
in place. |
1,800 |
$30.25 |
$54,450.00 |
| 66 |
For Testing for Exfiltration, as specified complete. |
|
|
|
| A |
Sanitary Sewer Pipe |
|
|
|
| 1 |
21-inch Pipe |
4,075 |
$0.90 |
$3,667.50 |
| 2 |
18-inch Pipe |
6,778 |
$0.80 |
$5,422.40 |
| 3 |
15-inch Pipe |
1,087 |
$0.75 |
$815.25 |
| 4 |
12-inch Pipe |
6,234 |
$0.70 |
$4,363.80 |
| 5 |
8-inch Pipe |
508 |
$0.60 |
$304.80 |
| B |
Manholes |
|
|
|
| 1 |
4-foot Diameter Manholes |
47 |
$80.00 |
$3,760.00 |
| 2 |
5-foot Diameter Manholes |
12 |
$80.00 |
$960.00 |
| |
Sum for project 292-02-666 |
|
|
$3,065,535.75 |
| |
CLEAR CREEK GRAVITY SANITARY SEWER |
|
|
|
| |
PROJECT NUMBER 200-03-569 |
|
|
|
| 67 |
For Furnishing and Installing Gravity Sanitary Sewer Pipe, as specified,
complete in place. |
|
|
|
| A |
12-inch Sanitary Sewer Pipe |
|
|
|
| 1 |
6 to 8 Depth |
22 |
$41.65 |
$916.30 |
| 2 |
8 to 10 Depth |
130 |
$43.10 |
$5,603.00 |
| 3 |
10 to 12 Depth |
12 |
$45.75 |
$549.00 |
| 4 |
12 to 14 Depth |
28 |
$49.10 |
$1,374.80 |
| B |
8-inch Sanitary Sewer Pipe |
|
|
|
| 1 |
6 to 8 Depth |
99 |
$37.90 |
$3,752.10 |
| 2 |
8 to 10 Depth |
248 |
$39.55 |
$9,808.40 |
| 3 |
10 to 12 Depth |
270 |
$49.50 |
$13,365.00 |
| 4 |
12 to 14 Depth |
492 |
$43.85 |
$21,574.20 |
| 5 |
14 to 16 Depth |
476 |
$48.25 |
$22,967.00 |
| 68 |
For Substituting Ductile Iron Pipe, as specified, complete in place. |
|
|
|
| A |
12 Ductile Iron Pipe (Pressure Class 250) (Add onto Item 66) |
192 |
$7.40 |
$1,420.80 |
| B |
8 Ductile Iron Pipe (Pressure Class 250) (Add onto Item 67) |
1,209 |
$9.90 |
$11,969.10 |
| 69 |
For Basic 0 to 6 Depth, Manholes as specified, backfilled, complete
in place. |
|
|
|
| A |
4-foot Diameter Manholes |
|
|
|
| 1 |
Bolted Down Frame and Cover |
7 |
$1,320.00 |
$9,240.00 |
| 70 |
For Extra Depth, All Manholes as specified, backfilled, complete
in place. |
|
|
|
| A |
4-foot Diameter Manholes |
65 |
$112.45 |
$7,309.25 |
| 71 |
For Furnishing and Installing Granular Bedding and Stabilization,
as specified, complete in place. |
|
|
|
| A |
Type III Bedding |
1,796 |
$1.65 |
$2,963.40 |
| 72 |
For Furnishing and Installing Stone Bedding and Stabilization, as
specified, complete in place. (For Undercut Excavation as directed
by the Engineer) |
80 |
$24.00 |
$1,920.00 |
| 73 |
For Clearing, Grubbing & Disposal of Debris, as specified, complete
in place |
1,777 |
$4.20 |
$7,463.40 |
| 74 |
For Constructing and Maintaining Various Erosion Control Devices,
as specified. |
|
|
|
| A |
Silt Fence |
1,800 |
$2.10 |
$3,780.00 |
| B |
Temporary Stream Crossings/Stream Bank Restoration |
1 |
$5,390.00 |
$5,390.00 |
| C |
Temporary Construction Entrance |
1 |
$1,080.00 |
$1,080.00 |
| D |
Curlex Blanket |
210 |
$2.50 |
$525.00 |
| E |
Temporary Diversion Ditch |
1,500 |
$1.25 |
$1,875.00 |
| F |
Temporary Sediment Trap |
|
|
|
| 1 |
Temporary Sediment Trap 200-300 CF |
4 |
$302.50 |
$1,210.00 |
| 75 |
For Fertilizer, Seed, and Mulching, as specified complete in place. |
10,300 |
$0.55 |
$5,665.00 |
| 76 |
For Furnishing and Installing Stone Rip-Rap, as specified, complete
in place. |
150 |
$30.25 |
$4,537.50 |
| 77 |
For Testing for Exfiltration, as specified complete. |
|
|
|
| A |
Sanitary Sewer Pipe |
|
|
|
| 1 |
12-inch Pipe |
192 |
$0.60 |
$115.20 |
| 2 |
8-inch Pipe |
1,604 |
$0.75 |
$1,203.00 |
| B |
Manholes |
|
|
|
| 1 |
4-foot Diameter Manholes |
7 |
$80.00 |
$560.00 |
| |
Sum for project 200-03-569 |
|
|
$148,136.45 |
| |
CLEAR CREEK GRAVITY SANITARY SEWER |
|
|
|
| |
PROJECT NUMBER 090-03-601 |
|
|
|
| 78 |
For Furnishing and Installing Gravity Sanitary Sewer Pipe, as specified,
complete in place. |
|
|
|
| A |
8-inch Sanitary Sewer Pipe |
|
|
|
| 1 |
0 to 6 Depth |
15 |
$44.10 |
$661.50 |
| 2 |
6 to 8 Depth |
321 |
$46.40 |
$14,894.40 |
| 3 |
8 to 10 Depth |
90 |
$49.15 |
$4,423.50 |
| 79 |
For Substituting Ductile Iron Pipe, as specified, complete in place. |
|
|
|
| A |
8 Ductile Iron Pipe (Pressure Class 250) (Add onto Item 87) |
198 |
$9.85 |
$1,950.30 |
| 80 |
For Basic 0 to 6 Depth, Manholes as specified, backfilled, complete
in place. |
|
|
|
| A |
4-foot Diameter Manholes |
|
|
|
| 1 |
Bolted Down Frame and Cover |
2 |
$1,365.00 |
$2,730.00 |
| 81 |
For Extra Depth, All Manholes as specified, backfilled, complete
in place. |
|
|
|
| A |
4-foot Diameter Manholes |
7 |
$113.00 |
$791.00 |
| 82 |
For Furnishing and Installing Grannular Bedding and Stabilization,
as specified, complete in place. |
|
|
|
| A |
Type III Bedding |
426 |
$1.65 |
$702.90 |
| 83 |
For Furnishing and Installing Stone Bedding and Stabilization, as
specified, complete in place. (For Undercut Excavation as directed
by the Engineer) |
20 |
$24.00 |
$480.00 |
| 84 |
For Furnishing and Installing (Dry-Bore) with Steel Encasement,
as specified, complete in place. |
|
|
|
| A |
30-inch Diameter Casing (0.312) |
159 |
$537.00 |
$85,383.00 |
| B |
Concrete Barriers (Bore Pits) |
50 |
$3.60 |
$180.00 |
| 85 |
For Mobilization, Excavation and Backfill for Bore Installation,
as specified, complete in place. |
1 |
$4,185.00 |
$4,185.00 |
| 86 |
For Grouting Incomplete Encasing Pipe, as specified, complete in
place |
|
|
|
| A |
30-inch Encasing Pipe (0.312) |
39 |
$282.00 |
$10,998.00 |
| 87 |
For Installing 48-inch Tunnel (12 Gauge), Anchoring the Carrier
Pipe, and necessary mortar end sealing, as specified, complete in
place. The unit price will not be less than the unit bid price for
boring. |
39 |
$1,806.00 |
$70,434.00 |
| 88 |
For Furnishing and Installing Soft Shoulder Signs as specified,
complete in place. |
4 |
$143.00 |
$572.00 |
| 89 |
For Clearing, Grubbing & Disposal of Debris, as specified, complete
in place |
426 |
$4.20 |
$1,789.20 |
| 90 |
For Constructing and Maintaining Various Erosion Control Devices,
as specified. |
|
|
|
| A |
Silt Fence |
230 |
$2.10 |
$483.00 |
| B |
Temporary Construction Entrance |
2 |
$1,080.00 |
$2,160.00 |
| C |
Jute Blanket |
50 |
$2.15 |
$107.50 |
| D |
Temporary Diversion Ditch |
200 |
$1.25 |
$250.00 |
| E |
Temporary Sediment Trap |
|
|
|
| 1 |
Temporary Sediment Trap 200-300 CF |
2 |
$302.50 |
$605.00 |
| 91 |
For Fertilizer, Seed, and Mulching, as specified complete in place. |
1,700 |
$0.55 |
$935.00 |
| 92 |
For Testing for Exfiltration, as specified complete. |
|
|
|
| A |
Sanitary Sewer Pipe |
|
|
|
| 1 |
8-inch Pipe |
426 |
$0.60 |
$255.60 |
| B |
Manholes |
|
|
|
| 1 |
4-foot Diameter Manholes |
2 |
$156.00 |
$312.00 |
| 93 |
For Removal and Replacement of Landscape Items, as specified, as
directed by the Engineer, complete in place. |
1 |
$5,000.00 |
$5,000.00 |
| |
Sum for project 090-03-601 |
|
|
$210,282.90 |
| |
CLEAR CREEK BASIN INTERIM PUMPING STATION AT BARTLETT ROAD AND CLEAR
CREEK PROJECT NUMBER 292-02-673: |
|
|
|
| 94 |
Clear Creek Pumping Station All costs for all labor, materials,
equipment, supplies, permits, fees, taxes, insurance, other miscellaneous
costs, profit and overhead, both direct and indirect, for completion
of all Work except for those Bid Items previously listed. |
1 |
$780,000.00 |
$780,000.00 |
| |
Base Bid |
|
|
$5,732,958.50 |
| 95 |
Mobilization |
1 |
$115,000.00 |
$115,000.00 |
| 96 |
Contingency Allowance (2% of Contract Subtotal plus Mobilization) |
|
|
$116,959.17 |
| |
Total Base Bid |
|
|
$5,964,917.67 |
| 97 |
Deductive Bid Alternate A - Elimination of Clear Creek Basin Interim
Pump Station at Bartlett Rd and Clear Creek (Bid Item #94) plus associated
mobilization and 2% contingency allowance. |
1 |
$800,000.00 |
$800,000.00 |
|